Sunday, August 19, 2012

That Looks Like a House


When we left for vacation I knew that a lot would be happening over the next week.  But I had no idea the progress we'd see once we returned home.  Just as Jason had estimated in the period of just a week the house went from the basement being framed to the roof being put up.
We got back from Alabama on Monday, August 13 and met with Jason at the house to discuss how everything was going.  It was going great.  I, unfortunately, had to immediately leave town again for a conference. By the time I got back on Thursday the roof decking was almost complete.
At this point the framing is essentially complete.  Start to finish it took right at two weeks.  It's absolutely amazing to me that in just two weeks an entire house can be framed.
The shingles are in place on site for the roof to be put on and I'd guess that at this rate it'll be done by the end of the week.  We're also meeting with Jason and the electrician sometime this week to map out where lighting, outlets, and data connections will be going.  Fortunately, I've been working on that already so hopefully things will go smoothly.

Sunday, August 5, 2012

All in a Days Work

We were told several times that the wait for this framer was worth it.  I am now a believer.  The framer started on Friday and in just one day got nearly the entire basement framed up.  We stopped by the house today and I could hardly believe it.  It would take me an entire week just to get up a single wall.
This trip Becca's parents joined us for the tour.  This was their first time out since we've started construction and were really excited to see it.  It was really fun getting to walk around through each room and start to see the plans that we've been working on for so long start to actually come into existence.
Now as great as it was to see this today it's a little bitter sweet because of some bad timing on our part.  Tomorrow night we leave for vacation in Orange Beach, AL and will be gone an entire week.  If this framer accomplished this much in a day imagine what's he's going to get done in a week.  Obviously I can't complain too much; I am heading to the beach.  But it is slightly disappointing we'll be missing so much progress.  Jason thinks that by the time we get back they'll be working on the ceiling joists for the top floor.  Pretty crazy.  

Saturday, August 4, 2012

Windows & Doors

The last week and half hasn't been particularly exciting at the house.  The framer that we're using was tied up at another house so any real visual progress came to a halt. Jason has assured me that this guys is worth waiting for and he actually was supposed to start yesterday.  We'll be stopping by Sunday to see what it looks like with walls starting to go up!
Now while nothing real noticeable has been happening doesn't mean we've come to a stop.  All the utility work was finished, obviously a pretty important part.  We also got the remaining fill brought in for the garage.    But the thing that's been most apparent to Becca and I has been picking out windows and doors.  Thursday we met with Jason at Herrman Lumber to discuss what we wanted.  Who knew windows could be such a hard decision.  Single hung, double hung, casement or fixed, grille or no grille, all kinds of sizes and colors: there are a lot of choices.  Fortunately most of them were pretty easy it really just came down to a couple of windows that we had a hard time deciding on.
One was the window over our sink in the kitchen.  I've seen a lot of pictures of houses with big windows over their kitchen sinks and Becca and I both decided we really like the look.  It just seemed silly to put the standard little window if you had the room to let a little more light in.  It's at the sacrifice of some of our overhead cabinets but I think it's worth it.  Below is a picture of our ideal kitchen window.


Sunday, July 29, 2012

Our Basement Floor

Last Friday we got our basement floor poured. We got a chance that Sunday to stop by and take a look and it was pretty neat. Walking around in what will be our basement was just another great opportunity to get a new perspective on the house. It was especially exciting walking into the area under our front porch as it's the only room that actually has all four of it's walls in place now. It looks bigger than I expected. We met my dad out there so he could take a look at our progress and had Zeda with us as well. It was fun watching the two of them play around and pretty funny listening her tell her Papa about her new house. Unfortunately, the framer our builder uses was working on another house in our neighborhood last week so nothing real noticeable happened this last week. Instead they worked on utility hookups which, while important, isn't very exciting. The plan is to start framing Wednesday. Everybody tells me that framing is the most exciting part of the whole process. We're certainly looking forward to it.

Saturday, July 21, 2012

A Little Shopping

Last Friday on the way out for our anniversary trip to Eureka Springs (you can read about that here) we met up with our builder, Jason, to do a little shopping.  We spent the next few hours going around to different spots in Springfield so he could show us places he recommends for getting ideas for our home.  The first stop  was Acme Brick to take a look at our multitude of brick options.  I actually think between the stop at Acme and then some sightseeing we did through some area neighborhoods throughout the weekend we've actually settled on Old Towne for our color.  There's one decision out of the way.

From there we moved on to Mussino Tile to look at some tile options and Herrman Lumber to look at doors, windows, and siding.  Jason reassured us that none of these choices had to be made right now but he wanted to show us some of the options we had for looking once we got some free time.

After a quick stop back by our "temporary housing" (we managed to forget Ezra's pacifier in our rush out the door which is not a good thing when you're heading out of town for the weekend) we swung by Ozark Marble for counter top and bathroom options and then on to Creative Associates.  Creative is a place that I've heard a lot about from people who have been doing remodeling.  It's kind of a catch all warehouse with everything from flooring to fixtures at really good prices.  They even have slot machines.  If it's as good as everyone says it is I'm sure I'll be writing about it more.

All in all it was a very good and very informative trip.  Plus we got to spend a bunch of time with Jason talking over a lot of different things.  It's really exciting and more than a little overwhelming getting to see all the decisions we have to make over the next five months.  Hopefully we can get the majority made way ahead of time and not elevate the anxiety level any more than necessary.

Wednesday, July 18, 2012

A Firm Foundation

A couple of days after breaking ground we got footings poured.  Those got to sit over the weekend and shortly afterwards the foundation was poured as well.  I'd say that this is the first point where the transition from "this seems really small" to "this seems way too big" occurred.  Unfortunately the foundation ended up needing to be higher on the back side of the house than we expected so even from the back the foundation wall seems tall.  We're still trying to figure out the best option for handling the basement backdoor, but the good thing is we do have options.  Since the foundation there have been a lot of less noticeable things including waterproofing, brick ledge, and fill.  Lots and lots of fill.  The same thing that makes our lot perfect for a walkout basement also means we have needed a lot of fill.  Fortunately our builder, Jason, has been able to get a hold of the fill basically for free.  Every little bit helps when you're on a budget.


Sunday, July 15, 2012

The Difference a Week Makes

It has been a busy last couple of weeks.  About three weeks ago, on June 26, we finally broke ground on the house.  It was a very exciting day and that alone would have been big enough news.  However, that evening we had someone stop by to take a second look at our house and by the time the showing was over we had an offer for a lease to own with the cash down payment already in our hands.  Add onto all this excitement is the fact that the couple buying the house wanted in ASAP and it left us with about a week and a half to move completely out of our house and into Becca's sister's basement.  Needless to say it's been a whirlwind.  In fact, tonight, nearly three weeks later is the first night I've been able to get the computer hooked up to the internet so I could sit down and write this entry.  A lot more has happened to the house since then including footings, foundation, and fill but I hope to come back this week and write a few more entries on each of those phases.  In the mean time, here are some pictures of the footings that were poured after the ground breaking.  I'm very happy to say that the house looks completely different than this today so stay tuned for more.